- Home
- Government
- Boards, Committees & Commissions
- Lake Welfare Committee
- Chapter 30 Permit Application
Chapter 30 Permit Application
FIGURES | APPENDICES |
---|---|
Figure 1 - Project SIte Location Map |
Appendix A - Permit Application Forms A-1 WPDEX General Permit Application Form A-2 Dredge Permit Application Form |
Figure 2 - Sediment Accumulation in Shoreline Areas |
Appendix B - Draft Environmental Assessment |
Figure 3 - Sediment Sample Locations and Dredge Areas |
Appendix C - WDNR Correspondence C-1 WDNR Letter to Mr. Steven Dischler (6/1/06) C-2 Foth Letter to Mr. Craig Helker (6/21/06) C-3 Foth Letter to Ms. Geri Radermacher (11/19/07) |
Figure 4 - 2007 Survey Transect Locations and Dredge Areas |
Appendix D - Restoration Plans for Dredge Locations |
Figure 5A - West Channel (South) Dredge Prism |
Appendix E - Project Cost Analysis |
Figure 5B - West Channel (South) Water Depth |
Appendix F - 2006 Sediment Sample Collection Procedures and Sediment Probe Logs |
Figure 6A - West Channel (North) Dredge Prism |
Appendix G - 2006 Sediment Sample Supplemental Test Results G-1 Pesticides G-2 Arsenic, Copper, Lead, and Zinc |
Figure 6B - West Channel (North) Water Depth |
Appendix H - Listing of Affected Riparian Owners |
Figure 7A - Northwest Channels (South) Dredge Prism |
Appendix I - Property Notifications/Agreements I-1 Affected Riparian Owners Notification Letter I-2 Dewatering Site Acceptance Letter from the City of Delafield I-3 Lang and Lake Country Land, LLC Property Easement Agreement I-4 Riparian Property Easement Agreements |
Figure 7B - Northwest Channels (South) Water Depth |
Appendix J - Aquatic Plant and Water Depth Survey |
Figure 8A - Northwest Channels (Central) Dredge Prism |
Appendix K - 2007 Dredge Alignment Transect Survey |
Figure 8B - Northwest Channels (Central) Water Depth |
Appendix L - Design Calculations L-1 Sedimentation Trap Design Calculations L-2 Process Design Calculations and Dewatering Pad Pump Sizing Calculations L-3 Geotextile Strength Calculations L-4 Geotextile Dewatering Tube Sizing Calculations |
Figure 9A - Northwest Channels (North) Dredge Prism |
Appendix M - Dredge Contingency and Spill Prevention Plan |
Figure 9B - Northwest Channels (North) Water Depth |
Appendix N - Dredging Specifications |
Figure 10A - Northeast Channels Dredge Prism |
Appendix O - City's Proposed Dredge Plans to DNR |
Figure 10B - Northeast Channels Water Depth |
|
Figure 11A - Bark River Inlet Dredge Prism |
|
Figure 11B - Bark River Inlet Water Depth |
|
Figure 12A - Zastrow's Bay (North) Dredge Prism |
|
Figure 12B - Zastrow's Bay (North) Water Depth |
|
Figure 13A - Zastrow's Bay (South) Dredge Prism |
|
Figure 13B - Zastrow's Bay (South) Water Depth |
|
Figure 14 - Sediment Slurry Pipe Alignment |
|
Figure 15 - Shoreline Staging Area |
|
Figure 16 - Slurry Pipe Alignment and Sediment Management Site |
|
Figure 17 - Sediment Management Site |
|
Figure 18 - Sediment Development Details |
|
Figure 19 - Site Development Details |
|
Figure 20 - Dredging Operation Details |
|
Figure 21 - Groundwater Contours |
|
Figure 22 - Overall Project Timeline |